Our Chengdu Office will open on Wednesday, March 29, 2023. With the address as follows.
Chengdu Office Address:
Room 730-731, Vanke Tower, No.50 Yunhua Road, Gaoxin District, Chengdu
Tel:(8628)8773 8399
Post Code:610041
Updated News
Removal Notice
We would like to inform you that with effect from 2nd December 2019, our Guangzhou Office will be relocated to the following address. Our telephone and fax numbers remain unchanged. Please update our correspondence address.
Global Data Limited, Guangzhou Office
Rm706, KangFuLai International Center, 219 Linhe Xi Heng Road, Tianhe District, Guangzhou
Postal Code: 510500
Tel No: (8620) 8923-1828 / 38 / 68 / 98 (remain unchanged)
Fax No: (8620) 8923-1238 (remain unchanged)
Thank you for your attention.
Global Data takes on Steelcase new project, consisting of 354 nodes with Panduit cat 6 cabling system
and 115 nodes Cisco AP Installation
Global Data is honored to take up Amway Asia-Pacific Data center’s cabling project, using Siemon MPO solution with a total of over 4000 core optical fiber
Office project for TEC Hong Kong; Meeting room and AV cabling, using Panduit cat.6 cabling.
Infrastructure upgrade for Honda Autoparts manufacturing, including 21 lines Backbone fier cable relay and Cisco core switch replacement 2xC4506E
Office project for WNS, including more than 600 nodes Commscope cat.6 cabling , APC 20KVA UPS, Bosch PA and alarm system, Polycom Video conference , Hikvision CCTV and Zkteco access control etc
Global Data is honored to take up Ford’s structural cabling project in Changshu, including Siemon Cabling, IT room build up, Fiber and cabble ladder work.
Global Data suncessfully signed with Edgewell for the Shanghai Office relocation Project, including Cabling, IT room build up, AV and ACS system, Cisco equipment.
Globaldata very proud to be engaged in a project for WNS, installing Systimax Category 6 Office cabling, patch panels, Acceess control system, CCTV ,UPS system.
Globaldata is proud to complete cabling and AV works for TEC 上海
Global data is pleased to take up Snapchats new meeting room AV system included Crestron central control, Biamp DSP, Audix ceiling microphone array, JBL speaker, Samsung 75″ monitor and NEC laser projector
Global Data Provides Service for Dupont Hk Office Infra structure Project, Including 200 Nodes Cabling, Wireless equipment Installation, IT Room set up and AV system Relocation.
Globaldata is pleased to partner with Allianz for their new office project, including 122 nodes cat 6 cabling system, IT Room construction included AC, power distribution, EMS, & UPS; door Access control system, cctv system, meeting room AV system
Globaldata is pleased to take up TDK’s new office IT project including Molex 1020 nodes cat 6,Molex 192 nodes cat 6 for rack, door Access control system, cctv system, meeting room AV system, IT Romm power distribution design & construction.